Difference between revisions of "GlueX TOF Meeting, May 19, 2021"

From GlueXWiki
Jump to: navigation, search
(first draft)
 
(Added the minutes)
Line 12: Line 12:
 
# TOF NIM paper
 
# TOF NIM paper
 
# Action Item Recap
 
# Action Item Recap
 +
 +
== Minutes ==
 +
 +
Present: Paul Eugenio, Mark Ito, Tim Whitlatch, Beni Zihlmann
 +
 +
There is a [https://bluejeans.com/s/AZJnaZ2Ys9i/recording of this meeting]. Log into the [https://jlab.bluejeans.com BlueJeans site] first to gain access (use your JLab credentials).
 +
 +
We met briefly.
 +
 +
* Authorization for Paul to come on-site is in process.
 +
* Beni will send Paul the coordinates of the PMTs to be replaced.
 +
* There is a light guide with a broken joint. Performance seems acceptable despite that. Paul may take a look during his visit. Tim and Beni think that first, we should do no harm.
 +
* We discussed the air light guide test. Tim noted that since the DIRC will not be installed during the coming run, physical interference for de-installation during the run, should that be called for, should not be an issue.
 +
* FSU is building a remote shift control center in Tallahassee. Many, many computer monitors will be involved.
 +
* Last week Survey and Alignment re-shot and re-fiducialized the TOF. The results are not back yet.
 +
* Paul may delay his trip for a week; to be decided.
 +
* We discussed shots.

Revision as of 16:15, 19 May 2021

GlueX Time-of-Flight Meeting
Wednesday, May 19, 2021
10:00 am EDT
BlueJeans: 350 531 998

Agenda

  1. Announcements
  2. Review of minutes from the last meeting
  3. PMT Repair
  4. TOF II Trigger
  5. TOF NIM paper
  6. Action Item Recap

Minutes

Present: Paul Eugenio, Mark Ito, Tim Whitlatch, Beni Zihlmann

There is a of this meeting. Log into the BlueJeans site first to gain access (use your JLab credentials).

We met briefly.

  • Authorization for Paul to come on-site is in process.
  • Beni will send Paul the coordinates of the PMTs to be replaced.
  • There is a light guide with a broken joint. Performance seems acceptable despite that. Paul may take a look during his visit. Tim and Beni think that first, we should do no harm.
  • We discussed the air light guide test. Tim noted that since the DIRC will not be installed during the coming run, physical interference for de-installation during the run, should that be called for, should not be an issue.
  • FSU is building a remote shift control center in Tallahassee. Many, many computer monitors will be involved.
  • Last week Survey and Alignment re-shot and re-fiducialized the TOF. The results are not back yet.
  • Paul may delay his trip for a week; to be decided.
  • We discussed shots.