Difference between revisions of "GlueX TOF Meeting, November 8, 2012"

From GlueXWiki
Jump to: navigation, search
m
Line 29: Line 29:
  
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .
 
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2012-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .
 +
 +
=Minutes=
 +
 +
New Note 27
 +
 +
sasha
 +
mark, beni, tim
 +
 +
batch 2 received
 +
10 tubes per day
 +
student 4 hours
 +
lecroy 1458 manual to sasha

Revision as of 14:05, 8 November 2012

GlueX TOF Meeting
Thursday, November 8, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
    1. MiniTOF
    2. TOF Gluing Fixture
    3. TOF Module Wrapper
  4. PMT testing
  5. Contract status
  6. Calibration and Alignment
  7. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .

Minutes

New Note 27

sasha mark, beni, tim

batch 2 received 10 tubes per day student 4 hours lecroy 1458 manual to sasha