Difference between revisions of "GlueX TOF Meeting, November 8, 2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "GlueX TOF Meeting<br> Thursday, November 8, 2012<br> 10:00 am EDT<br> JLab: CEBAF Center, F326<br> <!-- room reservation good through 6/20/2013 --> =Agenda= # Announcements # R...")
 
m
Line 12: Line 12:
 
## [http://hadron.physics.fsu.edu/wiki/index.php/GluingStructure TOF Gluing Fixture]
 
## [http://hadron.physics.fsu.edu/wiki/index.php/GluingStructure TOF Gluing Fixture]
 
## TOF Module Wrapper
 
## TOF Module Wrapper
 +
# [http://hadron.physics.fsu.edu/wiki/index.php/GlueX_Time-of-Flight PMT testing]
 
# Contract status
 
# Contract status
 
# Calibration and Alignment
 
# Calibration and Alignment

Revision as of 10:40, 8 November 2012

GlueX TOF Meeting
Thursday, November 8, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
    1. MiniTOF
    2. TOF Gluing Fixture
    3. TOF Module Wrapper
  4. PMT testing
  5. Contract status
  6. Calibration and Alignment
  7. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .