Difference between revisions of "GlueX TOF Meeting, October 25, 2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 10: | Line 10: | ||
# Mechanical design | # Mechanical design | ||
## [[http://hadron.physics.fsu.edu/wiki/index.php/MiniTOF MiniTOF]] | ## [[http://hadron.physics.fsu.edu/wiki/index.php/MiniTOF MiniTOF]] | ||
− | ## TOF Gluing Fixture | + | ## [[http://hadron.physics.fsu.edu/wiki/index.php/GluingStructure TOF Gluing Fixture]] |
## TOF Module Wrapper | ## TOF Module Wrapper | ||
# Contract status | # Contract status |
Revision as of 09:56, 25 October 2012
GlueX TOF Meeting
Thursday, October 25, 2012
10:00 am EDT
JLab: CEBAF Center, F326
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- [MiniTOF]
- [TOF Gluing Fixture]
- TOF Module Wrapper
- Contract status
- PMT assessments of batch 1 [wiki]
- Procurements
- Change request
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- meeting link
- Phone bridge ID: 13 7104
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .