Difference between revisions of "GlueX Target Design Review, February 8, 2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch, ==Review Slides== [https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20F...")
 
Line 1: Line 1:
 
Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch,  
 
Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch,  
  
==Review Slides==
+
==Agenda==
  
 +
*P&I Diagram [
 
[https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20February%2022,%202012.pptx Jim's Presentation]
 
[https://halldweb1.jlab.org/talks/2012-1Q/Hall%20D%20Target%20Design%20Status,%20February%2022,%202012.pptx Jim's Presentation]
  

Revision as of 08:27, 8 February 2013

Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch,

Agenda

  • P&I Diagram [

Jim's Presentation

Notes

  • Target volume of 0.4 l of liquid hydrogen expands to about 1000 l at STP.
  • Hall B pumps on scattering chamber with turbo pump all the time.
  • Jim added Lakeshore Cernox temperature sensors at various heights.
    • Chris requested that they be removable, to replace defective ones.
  • Chris recommends the Lakeshore Model 218 8-channel temperature monitor read-out unit.
  • System should be able to liquefy helium-4, taking it down to 3 K.
  • Jim will look into adding a relief tube to by-pass normal feed in case of boil off of target liquid.