Difference between revisions of "GlueX Target Meeting, January 18, 2011"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
m (Text replacement - "www/halldweb1/" to "www/halldweb/")
 
Line 27: Line 27:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .
  
 
=Minutes=
 
=Minutes=

Latest revision as of 06:10, 1 April 2015

Location, Time

Tuesday, January 18, 2011
1:30 pm EST
JLab: CEBAF Center, Room F326

Agenda

  1. Review minutes from previous meeting: all
  2. MOU Status: Mark

Communication

Videoconferencing

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .

Minutes

Attendees:

  • JLab: Mark Ito (chair), Chris Keith, Yi Qiang, Elliott Wolin
  • UMass: Rory Miskimen

UMass MOU

Mark reviewed notes from a meeting last week on the construction MOU with UMass. Allison Lung suggested some significant changes. We are thinking about how to proceed. We will have to schedule a discussion (perhaps at the next collaboration meeting).

Target Refrigerator

  • Chris asked for some guidance about how soon we will want to purchase the refrigerator.
  • He mentioned in passing that the unit being considered is water cooled and uses up to 11 kW.
  • He got a copy of the flow diagram for the Hall B cryotarget. It looks a bit on the complicated side.

Next Meeting

We will meet again in four weeks on Tuesday, February 15.