Difference between revisions of "GlueX Target Meeting, March 10, 2011"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
m (Text replacement - "www/halldweb1/" to "www/halldweb/")
 
(3 intermediate revisions by the same user not shown)
Line 28: Line 28:
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-1Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .
  
 
=Minutes=
 
=Minutes=
  
Target Meeting, 3/10
+
Present:
 +
* '''JLab''': Mark Ito (chair), Chris Keith, Tim Whitlatch, Elliott Wolin
 +
* '''UMass''': Rory Miskimen
  
send to Rory, v9
+
==MOU Status==
send target schedule to Rory
+
  
working at Mainz, working on low density carbon target
+
The last version of the MOU was stopped because it contained language about solid targets which were not in the baseline project plan. With the latest change request, solid targets appear as an item. We are nearly ready to send a version through the review process again. It will not be significantly different from what we had before.
graphite foam , conditioning 0.55 gm/cc
+
solves problem of wide angle particles seeing a lot of material
+
developed at Oak Ridge, company in Texas
+
poco graphite
+
  
on ETC
+
==New Target Material==
no money in 2011
+
 
oct 2011 we will buy refrigerator
+
Rory was recently working at Mainz on a low density carbon target made of graphite foam. It may be appropriate for Hall D commissioning. Its density is 0.55 gm/cc and will minimize the amount of material wide-angle particles see as they emerge from the target. The material was developed at Oak Ridge and is sold by a company in Texas, [http://www.poco.com/ Poco Graphite].
consgtruction early next year
+
 
design meetings in April
+
==Schedule==
 +
 
 +
Tim reported some details of the latest change to the Project as it affects the target. There is no money budgeted for FY11. We plan to purchase the refrigerator early in FY12 (October 2011) and start construction early next year.
 +
 
 +
==Future Meetings==
 +
 
 +
Tim would like to focus more attention on detailed design at future target meetings. Mark and Tim will announce possible changes to the meeting structure soon.

Latest revision as of 06:35, 1 April 2015

Location, Time

Thursday, March 10, 2011
1:30 pm EST
JLab: CEBAF Center, Room B101

Agenda

  1. Review minutes from previous meeting: all
  2. Target system news: all
  3. MOU Status: Mark
  4. Future meetings: Tim

Communication

Video Conferencing

No video conferencing for this meeting

Telephone

To connect by telephone:

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .

Minutes

Present:

  • JLab: Mark Ito (chair), Chris Keith, Tim Whitlatch, Elliott Wolin
  • UMass: Rory Miskimen

MOU Status

The last version of the MOU was stopped because it contained language about solid targets which were not in the baseline project plan. With the latest change request, solid targets appear as an item. We are nearly ready to send a version through the review process again. It will not be significantly different from what we had before.

New Target Material

Rory was recently working at Mainz on a low density carbon target made of graphite foam. It may be appropriate for Hall D commissioning. Its density is 0.55 gm/cc and will minimize the amount of material wide-angle particles see as they emerge from the target. The material was developed at Oak Ridge and is sold by a company in Texas, Poco Graphite.

Schedule

Tim reported some details of the latest change to the Project as it affects the target. There is no money budgeted for FY11. We plan to purchase the refrigerator early in FY12 (October 2011) and start construction early next year.

Future Meetings

Tim would like to focus more attention on detailed design at future target meetings. Mark and Tim will announce possible changes to the meeting structure soon.