Difference between revisions of "JEF meeting, April 1, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 13: Line 13:
 
** Igal continues cutting ESR / Tedlar
 
** Igal continues cutting ESR / Tedlar
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 209)
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 245)
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_1_22/modules_in_tedf_4_1_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_1_22/modules_in_tedf_4_1_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]

Revision as of 10:06, 1 April 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • 50 new CRYTUR crystals received
      • Need to perform a quality check
    • DSG group: preshaping (18 foils a day), wrapping (7 crystals a day on average, expect to wrap 10 crystals per day in the future).
    • Contract with the GWU is under preparation (SOW, sole source,...)
    • Chris A. continues to braze strips; discussions regarding brazing quality. Bobby preparing soft Iron housings.
    • Igal continues cutting ESR / Tedlar
  • Module fabrication -- Sasha
  • Light Monitoring System April 1 update -- Arshak
  • COMCAL tests, TAC running, etc. -- Sasha
    • A 3 x 3 calorimeter will be installed on the TAC platform. Will (can) be used as a TAC run during the CPP experiment and other tests in the future.
  • Data analysis
  • Simulations