=Minutes=
 +
Attendees:  Arshak,Igal,Tim W.,Phil,Tim B.,Zisis,Liping,Jon Z.,Sasha,Josh,Susan,S.T.
 +
*Procurement updates
 +
** The SICCAS crystals are at the lab but have not been inspected yet
 +
*** Sasha trying to coordinate with management to allow him and Vlad B. onto the JLab site to do this
 +
**Light guide samples have arrived at JLab
 +
**Brass pieces not arrived at JLab yet -- maybe today?
 +
**first 20 mu-metal pieces shipped on Monday
 +
*PAC jeopardy discussion
 +
** Consensus is that JEF physics is still solid and existing simulations are probably sufficient
 +
*** We might consider extending physics reach to include &pi;0e+e-, &phi;(scalar)&pi;0 where &phi;(scalar)&rarr;&pi;+&pi;-
 +
**We did think that we should work on exclusion plots for the dark scalar. Igal will work on this.
 +
** Will be discussing jeopardy in meeting with GlueX folks later on Friday.  Some unresolved issues:
 +
*** What kind of documentation will we need to provide?  Sasha will work on FCAL II construction table.
 +
*** What is overlap of 2 approved GlueX proposals and what does this mean for JEF running time (expected to be in parallel with GlueX)?  Management seems to want to merge the 2 running periods.

Latest revision as of 14:31, 17 April 2020

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

Minutes

Attendees: Arshak,Igal,Tim W.,Phil,Tim B.,Zisis,Liping,Jon Z.,Sasha,Josh,Susan,S.T.

  • Procurement updates
    • The SICCAS crystals are at the lab but have not been inspected yet
      • Sasha trying to coordinate with management to allow him and Vlad B. onto the JLab site to do this
    • Light guide samples have arrived at JLab
    • Brass pieces not arrived at JLab yet -- maybe today?
    • first 20 mu-metal pieces shipped on Monday
  • PAC jeopardy discussion
    • Consensus is that JEF physics is still solid and existing simulations are probably sufficient
      • We might consider extending physics reach to include π0e+e-, φ(scalar)π0 where φ(scalar)→π+π-
    • We did think that we should work on exclusion plots for the dark scalar. Igal will work on this.
    • Will be discussing jeopardy in meeting with GlueX folks later on Friday. Some unresolved issues:
      • What kind of documentation will we need to provide? Sasha will work on FCAL II construction table.
      • What is overlap of 2 approved GlueX proposals and what does this mean for JEF running time (expected to be in parallel with GlueX)? Management seems to want to merge the 2 running periods.