Difference between revisions of "JEF meeting, April 29, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 18: Line 18:
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_29_22/modules_in_tedf_4_29_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_29_22/modules_in_tedf_4_29_22.jpg  Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 +
* Cabling of the FCAL insert -- Sasha
 +
** Meeting with Fernando, Tim, and Chris S. regarding LV cable distribution [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/4_29_22/insert_lv_cables.jpg]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 
* COMCAL tests, TAC running, etc. -- Sasha
 
* COMCAL tests, TAC running, etc. -- Sasha

Revision as of 09:20, 29 April 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • Summer Students (2022)
    • DSG:
      • 860 SICCAS foils preshaped. Need to preshape about 40 more, will switch to CRYTUR foils then
      • Wrapping rate: about 20 crystals per week
    • Chris A continues to braze starps (have right now about 40 assemblies)
    • Igal continues cutting ESR, Tedlar, and Kapton foils
    • Silicon cookies (GWU)
      • Olga is planning to come in the beginning of next week and bring some cookies (about 400), see her report
  • Module fabrication -- Sasha
  • Cabling of the FCAL insert -- Sasha
    • Meeting with Fernando, Tim, and Chris S. regarding LV cable distribution [1]
  • Light Monitoring System -- Arshak
  • COMCAL tests, TAC running, etc. -- Sasha
  • Data analysis
  • Simulations
  • Workshops/external meetings