Difference between revisions of "JEF meeting, April 3, 2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...")
 
 
Line 25: Line 25:
 
* COMCAL tests, TAC running, etc.
 
* COMCAL tests, TAC running, etc.
 
* Preparations for PAC meeting (jeopardy)
 
* Preparations for PAC meeting (jeopardy)
 +
 +
=Minutes=
 +
Attendees:  Josh, Zisis, Igal, Mike McC., Jane, Tim W., Varun, Jon Z., Liping, Yeranuhl G., Arshak, Tim B., S.T.
 +
* PAC jeopardy
 +
** GlueX experiments are expected to undergo jeopardy review at the next PAC
 +
** JEF is a Run Group experiment expected to run in parallel with GlueX w/DIRC
 +
** Not clear what PAC expects for Run Group experiments, but we will prepare slides anyway -- set internal goal of May 1 with updates next week
 +
** Need simulation with/without DIRC (need to check with Sasha regarding past simulations)
 +
** Need to refresh physics argument (new B-boson limit plot from Sean Tulin?, work on limit estimates for scalar)
 +
** Need to look at backgrounds again; S. T.  will resurrect scalar_gen code for 2pi0 background
 +
** What about long-lived particles or invisible decays of B-boson/scalar?
 +
* Status of hardware shipments
 +
** No word on status of SICCAS crystals
 +
** Expect mu-metal shields next week
 +
** Expect 20 light guide samples (cheaper price!) within next 2 weeks
 +
** Brass pieces still pending
 +
** All other hardware pieces needed for module assembly ready to go
 +
* Tim B. mentioned he needs a circuit diagram for a Gaussian function generator
 +
** Coordination between Josh and Fernanda B. with Tim B. underway
 +
* Summer students
 +
** Not clear what the schedule is for lifting MedCon 6 (lab closed), need to find tasks for people to do remotely.

Latest revision as of 10:00, 3 April 2020

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

Minutes

Attendees: Josh, Zisis, Igal, Mike McC., Jane, Tim W., Varun, Jon Z., Liping, Yeranuhl G., Arshak, Tim B., S.T.

  • PAC jeopardy
    • GlueX experiments are expected to undergo jeopardy review at the next PAC
    • JEF is a Run Group experiment expected to run in parallel with GlueX w/DIRC
    • Not clear what PAC expects for Run Group experiments, but we will prepare slides anyway -- set internal goal of May 1 with updates next week
    • Need simulation with/without DIRC (need to check with Sasha regarding past simulations)
    • Need to refresh physics argument (new B-boson limit plot from Sean Tulin?, work on limit estimates for scalar)
    • Need to look at backgrounds again; S. T. will resurrect scalar_gen code for 2pi0 background
    • What about long-lived particles or invisible decays of B-boson/scalar?
  • Status of hardware shipments
    • No word on status of SICCAS crystals
    • Expect mu-metal shields next week
    • Expect 20 light guide samples (cheaper price!) within next 2 weeks
    • Brass pieces still pending
    • All other hardware pieces needed for module assembly ready to go
  • Tim B. mentioned he needs a circuit diagram for a Gaussian function generator
    • Coordination between Josh and Fernanda B. with Tim B. underway
  • Summer students
    • Not clear what the schedule is for lifting MedCon 6 (lab closed), need to find tasks for people to do remotely.