Difference between revisions of "JEF meeting, April 9, 2021"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 25: Line 25:
 
* SICCAS crystals
 
* SICCAS crystals
 
* Module fabrication
 
* Module fabrication
 
+
[[File:mod_fab.jpg|Fabricated modules]
 
* COMCAL tests, TAC running, etc.
 
* COMCAL tests, TAC running, etc.
 
* Data analysis
 
* Data analysis
 
* Simulations
 
* Simulations

Revision as of 08:49, 9 April 2021

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • Announcements
  1. Muon g-2 is 4.2 sigma! Fermilab result is consistent with BNL. Still deviated from SM prediction, https://www.youtube.com/watch?v=81PfYnpuOPA
  • SICCAS crystals
  • Module fabrication

[[File:mod_fab.jpg|Fabricated modules]

  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations