Difference between revisions of "JEF meeting, August 21, 2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 9:30 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...")
 
m (Minutes)
 
(8 intermediate revisions by 4 users not shown)
Line 22: Line 22:
 
=Agenda=
 
=Agenda=
 
* SICCAS crystals
 
* SICCAS crystals
 +
** PS test setup
 +
::: [https://logbooks.jlab.org/entry/3830677 Colored crystals installed in the PS setup]
 +
::: [https://logbooks.jlab.org/entry/3831858 Comparison of light yield of colored crystals]
 
* [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication]
 
* [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication]
 
* COMCAL tests, TAC running, etc.
 
* COMCAL tests, TAC running, etc.
 
* Simulations  
 
* Simulations  
 +
** [https://halldweb1.jlab.org/wiki/index.php/File:FCAL2_effic_NoUpstreamMaterial.png FCAL2 efficiency] with no upstream material (other than air)
 +
** [https://halldweb.jlab.org/wiki/images/b/b2/Glue-jefxd-igal-jaegle-21082020.pdf Selection criteria effect]
 
* Snowmass contribution
 
* Snowmass contribution
 +
 +
=Minutes=
 +
Attendees: Igal, Arshak, Varun, Jared, Phil, Zisis, Jon, Sasha, Tim W., Jane Josh, Tim B., S.T.
 +
* Sasha and Josh had previously installed 9 "good" crystals in the PS setup in Hall-D to study light yields.
 +
** Choose 1 as a reference for light yield comparisons to study "bad" crystals
 +
** Swapped out 6 crystals, installed crystals showing various levels of discoloration (yellow, brown,...)
 +
** Discolored crystals show notable degradation in light yield and energy resolution.
 +
*** The worst 2 have 25% worse amplitude and would be rejected (Sasha suggested a 20% threshold w.r.t. nominal "good" crystals)
 +
*** One crystal is right at the border (-20% amplitude) for being rejected: S.T. asked whether it was worth trying to cure this one; Sasha will consider
 +
** Next plan to install crystals that appear to have bubbles or other internal imperfections
 +
** Also plan to install Crytur crystals (expected to be better than SICCAS crystals, plan to use as real reference crystals)
 +
* New light guides:  quality better than previous vendor; some evidence for machine marks, could do with better polishing, but satisfactory for what we need
 +
* PMT divider redesign: slow progress, would help if had face-to-face between Vlad P. and Sasha
 +
** Plan to install revised version in COMCAL; had hoped to do before TAC run (very soon, if beam comes back!)
 +
** Sasha would like to test linearity, will need to coordinate with GlueX run coordinator
 +
* PMT/divider testing - Phil indicated interest in working on this.
 +
* Igal continued studies of &eta;&rarr;&pi;0&gamma;&gamma; channel and 3&pi;0 background
 +
** Optimization of selection criteria
 +
** Switched to using DReactionFilter with kinematic fitter:  &chi;^2 is most powerful cut
 +
** Noticed that there was not a huge difference in signal purity between FCAL and FCAL-2 after cut optimization, although resolution got better with FCAL-2
 +
** Question about shower threshold:  S.T. indicated that it is currently the same for both FCAL lead glass blocks and insert
 +
** Question about covariance matrix: S. T. implemented a diagonal matrix in the code for insert based on Sasha's measurements
 +
*** There is a plan to redo exercise to determine covariance matrix for FCAL, will try to learn how to do this for FCAL-2
 +
* Jon looked at FCAL-2 efficiency with MC with material in front of FCAL-2 turned off -- efficiency looks flat at ~99% above 2 degrees
 +
** Indicates features in previous plot due to FDC chambers and other sources of material upstream of the FCAL
 +
* Liping has completed a draft of our contribution to the Snowmass effort.

Latest revision as of 14:16, 21 August 2020

Meeting time and location= 9:30 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
    • PS test setup
Colored crystals installed in the PS setup
Comparison of light yield of colored crystals

Minutes

Attendees: Igal, Arshak, Varun, Jared, Phil, Zisis, Jon, Sasha, Tim W., Jane Josh, Tim B., S.T.

  • Sasha and Josh had previously installed 9 "good" crystals in the PS setup in Hall-D to study light yields.
    • Choose 1 as a reference for light yield comparisons to study "bad" crystals
    • Swapped out 6 crystals, installed crystals showing various levels of discoloration (yellow, brown,...)
    • Discolored crystals show notable degradation in light yield and energy resolution.
      • The worst 2 have 25% worse amplitude and would be rejected (Sasha suggested a 20% threshold w.r.t. nominal "good" crystals)
      • One crystal is right at the border (-20% amplitude) for being rejected: S.T. asked whether it was worth trying to cure this one; Sasha will consider
    • Next plan to install crystals that appear to have bubbles or other internal imperfections
    • Also plan to install Crytur crystals (expected to be better than SICCAS crystals, plan to use as real reference crystals)
  • New light guides: quality better than previous vendor; some evidence for machine marks, could do with better polishing, but satisfactory for what we need
  • PMT divider redesign: slow progress, would help if had face-to-face between Vlad P. and Sasha
    • Plan to install revised version in COMCAL; had hoped to do before TAC run (very soon, if beam comes back!)
    • Sasha would like to test linearity, will need to coordinate with GlueX run coordinator
  • PMT/divider testing - Phil indicated interest in working on this.
  • Igal continued studies of η→π0γγ channel and 3π0 background
    • Optimization of selection criteria
    • Switched to using DReactionFilter with kinematic fitter: χ^2 is most powerful cut
    • Noticed that there was not a huge difference in signal purity between FCAL and FCAL-2 after cut optimization, although resolution got better with FCAL-2
    • Question about shower threshold: S.T. indicated that it is currently the same for both FCAL lead glass blocks and insert
    • Question about covariance matrix: S. T. implemented a diagonal matrix in the code for insert based on Sasha's measurements
      • There is a plan to redo exercise to determine covariance matrix for FCAL, will try to learn how to do this for FCAL-2
  • Jon looked at FCAL-2 efficiency with MC with material in front of FCAL-2 turned off -- efficiency looks flat at ~99% above 2 degrees
    • Indicates features in previous plot due to FDC chambers and other sources of material upstream of the FCAL
  • Liping has completed a draft of our contribution to the Snowmass effort.