Difference between revisions of "JEF meeting, December 10, 2021"

From GlueXWiki
Jump to: navigation, search
(Minutes)
 
Line 37: Line 37:
 
* We had a discussion regarding assistance from undergraduate students during the upcoming summer
 
* We had a discussion regarding assistance from undergraduate students during the upcoming summer
 
** Phil can potentially supply 2+ students
 
** Phil can potentially supply 2+ students
** Phil asked for a list of tasks, needed before January 21st;  this info is available on the [https://halldweb.jlab.org/wiki-private/index.php wiki].
+
** Phil asked for a list of tasks, needed before January 21st;  this info is available on the [https://halldweb.jlab.org/wiki-private/index.php/FCAL_2_Construction wiki].
 
* We need to fix a date for meeting with admin regarding crystal situation
 
* We need to fix a date for meeting with admin regarding crystal situation

Latest revision as of 14:18, 13 December 2021

Meeting time and location= 9:30 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
  • Module fabrication
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations

Minutes

Attendees: Phil,Arshak,Zisis,Igal,Jon,Liping,Azizah,Jane,S.T.

  • We had a discussion regarding the Light Monitoring System (LMS) for FCAL2
    • Do we adapt the FCAL system (using plates of plexiglas) or use individual fibers a la COMCAL?
    • Insert crystals will be recessed relative to the face of the existing FCAL and are shorter in length than the FCAL lead glass blocks
    • Lead tungstate shower development different in depth relative to lead glass
    • Do special test with spare piece of plexiglas to see how well that option will work?
    • S.T. will add to the agenda for next year
  • We had a discussion regarding assistance from undergraduate students during the upcoming summer
    • Phil can potentially supply 2+ students
    • Phil asked for a list of tasks, needed before January 21st; this info is available on the wiki.
  • We need to fix a date for meeting with admin regarding crystal situation