Attendees: Sasha, Arshak, Phil, Igal, Malte, Jane, Jon, Liping, Azizah, Bill, Zisis, Axel

  • Arshak presented progress on measuring cross talk due to LMS plexiglas plate using 3x3 setup in PS test stand in hall
    • PbW04 module in center, dummies with just ESR wrapping on left and right, long light guides on top and bottom
    • Front face blocked on one side of center, open on other side
    • Light guides still present for dummies
    • Secondary lepton beam hits ~center of crystal, in coincidence with PS tile
      • Could be centered a little better
    • Almost the same amplitudes of signals on left and right tubes = almost no cross talk
      • Small asymmetry is seen -- suggest swapping which face is closed
      • Could do test without light guides on left and right
      • Look at energy distribution of possible cross talk?
    • Redo test with a true 3x3 prototype of crystals?
  • COMCAL will be disassembled next year -- leave a 5x5 array for tests with new PMT dividers?
  • Still continuing to receive Crytur crystals, expect more by end of year, and expect new batch in May of next year
  • Wrapping of existing crystals continues -- 30 more to go
  • Mindy from detector support group soldering wires to PMT sockets
  • Inventory of parts needed for module fabrication looks good
  • Grand total fabricated modules = 1371, hope for 1400 by end of year
  • Bench tests for PMT dividers (two versions: bypassed amplifier and 3x amplifier) ongoing
    • Concern: NPS experience with higher gain amplifier (20x vs 3x) = large noise level, 200 MHz frequency -- do we need to be concerned? Probably not due to smaller gain amplifier
    • Noise tests inside FCAL dark room
      • With bypassed amplifier: FCAL HV off: low noise; FCAL HV on: some noise spikes
      • With 3x amplifer: see CANBUS activity and higher amplitude noise level with FCAL HV off, increases with FCAL HV on
        • Still looks like ~3 mV threshold should be possible
      • Bring 3x3 crystal prototype into dark room?
      • Use shielded cables for CANBUS?
  • Need to give green light to Fernando regarding PMT divider order soon
  • Patch panel design: separation of HV and LV
  • List of summer students is growing:
    • 2 from Lamar, 2 from URegina, up to 4 from UNCW, 1 from GWU
    • Lab will support students at some level
    • Sasha anticipates needing 11 students for 3 months