Difference between revisions of "JEF meeting, February 21, 2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 10:00 am EST (JLab time) CC-F226 =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jlab.org/...")
 
(Agenda)
Line 24: Line 24:
 
* Status of the crystal production (SICCAS)
 
* Status of the crystal production (SICCAS)
 
* [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication]
 
* [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication]
 +
** Parts/Materials to be supplied by Tim
 +
*** Brass straps (.001" x 0.5" x 3400') - received and in cleanroom
 +
*** G10 PMT holders - qty 1650 - received and in cleanroom
 +
*** Kapton film 25um Qty (300 ft)  HN Kapton film x 12" wide - received and in cleanroom
 +
*** Qty (1) roll 1" 25um  thick Kapton tape (63um with adhesive) - received and in cleanroom
 +
*** 66813-B-03501 brass upstream plate - 500 on order - remainder will be done by CMU later
 +
*** 66813-B-03503 brass jacking plate - 500 on order - remainer to be made by CMU later
 +
*** 1020 Steel PMT shield/Housing qty 1620 - being fabricated by CMU
 +
*** 350um Mu metal shield qty 1620 - Purchase req submitted, waiting for order to be placed (out for competitive bid)

Revision as of 14:31, 20 February 2020

Meeting time and location= 10:00 am EST (JLab time) CC-F226


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • Infrastructure update (TEDF, light yield setup, etc.)
  • Status of the crystal production (SICCAS)
  • Preparation for module fabrication
    • Parts/Materials to be supplied by Tim
      • Brass straps (.001" x 0.5" x 3400') - received and in cleanroom
      • G10 PMT holders - qty 1650 - received and in cleanroom
      • Kapton film 25um Qty (300 ft) HN Kapton film x 12" wide - received and in cleanroom
      • Qty (1) roll 1" 25um thick Kapton tape (63um with adhesive) - received and in cleanroom
      • 66813-B-03501 brass upstream plate - 500 on order - remainder will be done by CMU later
      • 66813-B-03503 brass jacking plate - 500 on order - remainer to be made by CMU later
      • 1020 Steel PMT shield/Housing qty 1620 - being fabricated by CMU
      • 350um Mu metal shield qty 1620 - Purchase req submitted, waiting for order to be placed (out for competitive bid)