Difference between revisions of "JEF meeting, January 12, 2024"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")
 
 
Line 11: Line 11:
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad  
 
* '''Analysis/Simulation'''
 
* '''Analysis/Simulation'''
 +
 +
=Minutes=
 +
Attendees: Igal, Sasha, Bill, Arshak, Liping, Jane, Phil, Vlad, Stjepan, Olga, S.T.
 +
 +
* Work on FCAL-2 was stalled for about 4 days due to delayed implementation of ePas
 +
* Aoran worked on implementation of ECAL/FCAL into the translation table needed for reconstruction code
 +
** Ready to submit to ccdb
 +
* Plexiglas for FCAL LMS not installed as of meeting time
 +
* Components for insert LMS moved to hall
 +
* Phil can provide a returning student (Aaron) in the summer

Latest revision as of 08:56, 16 January 2024

Meeting time and location:


Agenda

  • Preparation of parts for ECAL -- Sasha
  • Ongoing projects -- Sasha, all
  • Testing of PMT dividers -- Sasha / Vlad / Aoran
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad
  • Analysis/Simulation

Minutes

Attendees: Igal, Sasha, Bill, Arshak, Liping, Jane, Phil, Vlad, Stjepan, Olga, S.T.

  • Work on FCAL-2 was stalled for about 4 days due to delayed implementation of ePas
  • Aoran worked on implementation of ECAL/FCAL into the translation table needed for reconstruction code
    • Ready to submit to ccdb
  • Plexiglas for FCAL LMS not installed as of meeting time
  • Components for insert LMS moved to hall
  • Phil can provide a returning student (Aaron) in the summer