Difference between revisions of "JEF meeting, January 8, 2021"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 27: Line 27:
 
* Contributions to upcoming April APS/GHP meetings
 
* Contributions to upcoming April APS/GHP meetings
 
#* [https://halldweb.jlab.org/wiki/images/b/b7/GHP2021.pdf GHP's abstract]
 
#* [https://halldweb.jlab.org/wiki/images/b/b7/GHP2021.pdf GHP's abstract]
 +
 +
=Minutes=
 +
Attendees: Sasha,Zisis,Susan,Igal,Jane,Tim B.,Jared,Phil,Jon,Varun,Liping,S.T.
 +
* No news from SICCAS; plan to set up meeting with Chinese company to give feedback and discuss production plans
 +
* Four modules have been constructed
 +
* Lab in EEL was shut down briefly due to a COVID-19 issue, now open, Sasha will do linearity test of amplifiers used in PMT base redesign
 +
* Loan agreement with Regina moving forward
 +
* S.T. added code to implement the "Island" algorithm for FCAL reconstruction
 +
* Sasha submitted an abstract to the upcoming APS meeting; Igal will submit an abstract to the GHP meeting

Latest revision as of 08:43, 11 January 2021

Meeting time and location= 8:30 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations
  • Contributions to upcoming April APS/GHP meetings

Minutes

Attendees: Sasha,Zisis,Susan,Igal,Jane,Tim B.,Jared,Phil,Jon,Varun,Liping,S.T.

  • No news from SICCAS; plan to set up meeting with Chinese company to give feedback and discuss production plans
  • Four modules have been constructed
  • Lab in EEL was shut down briefly due to a COVID-19 issue, now open, Sasha will do linearity test of amplifiers used in PMT base redesign
  • Loan agreement with Regina moving forward
  • S.T. added code to implement the "Island" algorithm for FCAL reconstruction
  • Sasha submitted an abstract to the upcoming APS meeting; Igal will submit an abstract to the GHP meeting