=Minutes=
 +
Attendees: Josh, Wolfgang, Simon, Sasha
 +
* Josh is finalizing the design of the assembly (shown above) to study 12 crystals at a time in the hall
 +
** The assembly will fit inside a soft-iron box (for magnetic shielding) that will be mounted downstream of the new penetration in the shield blocks downstream of the pair spectrometer
 +
** A first prototype should be ready to go in about 2 weeks.
 +
* There was some discussion as to how to study the light guide performance.  The thought was to start with using the assembly above and then for more detailed studies to build off the concept used for 3x3 shielding prototype used for magnetic shielding studies.  Would study no light guide and 3.5 cm light guide.

Latest revision as of 07:51, 15 July 2019

Meeting time and location= 1:00 pm EST (JLab time) F228


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 370588741. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

Update from Josh Test bench.png

Minutes

Attendees: Josh, Wolfgang, Simon, Sasha

  • Josh is finalizing the design of the assembly (shown above) to study 12 crystals at a time in the hall
    • The assembly will fit inside a soft-iron box (for magnetic shielding) that will be mounted downstream of the new penetration in the shield blocks downstream of the pair spectrometer
    • A first prototype should be ready to go in about 2 weeks.
  • There was some discussion as to how to study the light guide performance. The thought was to start with using the assembly above and then for more detailed studies to build off the concept used for 3x3 shielding prototype used for magnetic shielding studies. Would study no light guide and 3.5 cm light guide.