Attendees: Arshak,Igal,Jon,Zisis,Liping,Josh,Tim W.,Susan,Sasha,Phil,Bill B.,S.T.
 +
* Still waiting for new light guide samples
 +
* mu-metal shields:  company obtained new tooling ~2 weeks go, still waiting for fixed shields
 +
* Sasha will talk to SICCAS contact week of 7/20/20, also hope to be able to work on QA (dimensions + ?) of received crystals
 +
** Not able to work in Hall-C lab, move some equipment to TEDF?
 +
** If light guides arrive, work on module assembly for beam test?
 +
** Can do some test using sodium-22 source
 +
* Chris S. working on revised PMT base layout
 +
** Space for dip switches
 +
** Still need some resistor info from Vlad P.
 +
** Plan for  Chris to assemble 2 bases to install in COMCAL
 +
* Order placed for HV
 +
* Contract work for new SICCAS order ongoing
 +
* Igal gave a presentation showing his work on simulations for η→π0γγ
 +
** Some discussion about how to estimate number of expected ηs
 +
** How to fold in random backgrounds?  Use COMCAL data?
 +
** Do we need to fold in beam polarization?
 +
** Retrain ML for splitoffs? Matt suggests wait until have real data
 +
** Some structure seen in π0γ for B-boson test need to be understood
 +
** Suggestions brought up during discussion:
 +
*** Look at efficiency
 +
*** Look at Dalitz distribution
 +
*** Look at η→3π0 background
 +
*** Look at using an existing tool such as [https://www-hades.gsi.de/?q=pluto pluto] to deal with η decays
 +
* Plan to create common directory accessible on ifarm for JEF simulations
 +
* Sasha will look into elog for JEF
 +
* Liping plans to work on letter of intent for Snowmass
 +
* Meeting ended with discussion of what work can be done remotely given MEDCON-5
 +
** PMT base checkout?
 +
** Igal suggested Phil's student could help out with dark scalar efforts

Latest revision as of 07:38, 20 July 2020

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

Minutes

Attendees: Arshak,Igal,Jon,Zisis,Liping,Josh,Tim W.,Susan,Sasha,Phil,Bill B.,S.T.

  • Still waiting for new light guide samples
  • mu-metal shields: company obtained new tooling ~2 weeks go, still waiting for fixed shields
  • Sasha will talk to SICCAS contact week of 7/20/20, also hope to be able to work on QA (dimensions + ?) of received crystals
    • Not able to work in Hall-C lab, move some equipment to TEDF?
    • If light guides arrive, work on module assembly for beam test?
    • Can do some test using sodium-22 source
  • Chris S. working on revised PMT base layout
    • Space for dip switches
    • Still need some resistor info from Vlad P.
    • Plan for Chris to assemble 2 bases to install in COMCAL
  • Order placed for HV
  • Contract work for new SICCAS order ongoing
  • Igal gave a presentation showing his work on simulations for η→π0γγ
    • Some discussion about how to estimate number of expected ηs
    • How to fold in random backgrounds? Use COMCAL data?
    • Do we need to fold in beam polarization?
    • Retrain ML for splitoffs? Matt suggests wait until have real data
    • Some structure seen in π0γ for B-boson test need to be understood
    • Suggestions brought up during discussion:
      • Look at efficiency
      • Look at Dalitz distribution
      • Look at η→3π0 background
      • Look at using an existing tool such as pluto to deal with η decays
  • Plan to create common directory accessible on ifarm for JEF simulations
  • Sasha will look into elog for JEF
  • Liping plans to work on letter of intent for Snowmass
  • Meeting ended with discussion of what work can be done remotely given MEDCON-5
    • PMT base checkout?
    • Igal suggested Phil's student could help out with dark scalar efforts