=Minutes=
 +
Attendees: Igal, Bill B.,Phil, Sasha, Varun, Azizah, Liping, Jon, Arshak, Zisis, S.T.
 +
* Sasha will follow up with SICCAS this weekend regarding status of raw material
 +
** Awaiting revised crystal delivery schedule
 +
* Joanna from UNCW started working on wrapping crystals
 +
* Sasha continuing refurbishment of COMCAL
 +
** SHV/lemo connectors installed
 +
** Will mount LMS plate today
 +
** Obtained new UV glue dispenser for use in attaching fibers to crystals
 +
* Azizah and Varun started working on testing Island/default FCAL shower reconstruction

Latest revision as of 13:17, 23 July 2021

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
  • Module fabrication
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations

Minutes

Attendees: Igal, Bill B.,Phil, Sasha, Varun, Azizah, Liping, Jon, Arshak, Zisis, S.T.

  • Sasha will follow up with SICCAS this weekend regarding status of raw material
    • Awaiting revised crystal delivery schedule
  • Joanna from UNCW started working on wrapping crystals
  • Sasha continuing refurbishment of COMCAL
    • SHV/lemo connectors installed
    • Will mount LMS plate today
    • Obtained new UV glue dispenser for use in attaching fibers to crystals
  • Azizah and Varun started working on testing Island/default FCAL shower reconstruction