Difference between revisions of "JEF meeting, July 30, 2021"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...")
 
Line 26: Line 26:
 
* Data analysis
 
* Data analysis
 
* Simulations
 
* Simulations
 +
 +
=Minutes=
 +
Attendees:  Liping, Igal, Sasha, Varun, Jane, Jon, Phil, S.T.
 +
 +
* SICCAS recieved powder from vendor, working on making sample crystals to test
 +
** We will try to arrange a follow-up meeting in the near future
 +
** Still awaiting update on delivery schedule
 +
* Crytur confirmed can produce crystals this year
 +
* COMCAL refurbishment almost complete
 +
** All electronics installed
 +
*** Sasha looked at signals:  operational except for 3 channels with new dividers, to be fixed
 +
** LMS ready to go: fibers glued to crystals
 +
*** Amount of light more than expected but not uniform:  depends on where fiber is with respect to the center of the bundle
 +
*** Working on adding a diffuser to improve uniformity
 +
*** Considering using more than one LED
 +
** Install in hall next week?
 +
* Joanna continues wrapping crystals, can do 5-8/day
 +
* Igal looking into adding muon detector into JEF simulation
 +
* Igal generating new MC samples for &eta;&rarr;&pi;0&gamma;&gamma; studies

Revision as of 11:39, 30 July 2021

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
  • Module fabrication
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations

Minutes

Attendees: Liping, Igal, Sasha, Varun, Jane, Jon, Phil, S.T.

  • SICCAS recieved powder from vendor, working on making sample crystals to test
    • We will try to arrange a follow-up meeting in the near future
    • Still awaiting update on delivery schedule
  • Crytur confirmed can produce crystals this year
  • COMCAL refurbishment almost complete
    • All electronics installed
      • Sasha looked at signals: operational except for 3 channels with new dividers, to be fixed
    • LMS ready to go: fibers glued to crystals
      • Amount of light more than expected but not uniform: depends on where fiber is with respect to the center of the bundle
      • Working on adding a diffuser to improve uniformity
      • Considering using more than one LED
    • Install in hall next week?
  • Joanna continues wrapping crystals, can do 5-8/day
  • Igal looking into adding muon detector into JEF simulation
  • Igal generating new MC samples for η→π0γγ studies