Difference between revisions of "JEF meeting, July 30, 2021"

From GlueXWiki
Jump to: navigation, search
m (Minutes)
 
Line 43: Line 43:
 
** Install in hall next week?
 
** Install in hall next week?
 
* Joanna continues wrapping crystals, can do 5-8/day
 
* Joanna continues wrapping crystals, can do 5-8/day
* Igal looking into adding muon detector into JEF simulation
+
* Igal looking into adding CPP muon detector into JEF simulation
 
* Igal generating new MC samples for η→π0γγ studies
 
* Igal generating new MC samples for η→π0γγ studies

Latest revision as of 11:41, 30 July 2021

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
  • Module fabrication
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations

Minutes

Attendees: Liping, Igal, Sasha, Varun, Jane, Jon, Phil, S.T.

  • SICCAS recieved powder from vendor, working on making sample crystals to test
    • We will try to arrange a follow-up meeting in the near future
    • Still awaiting update on delivery schedule
  • Crytur confirmed can produce crystals this year
  • COMCAL refurbishment almost complete
    • All electronics installed
      • Sasha looked at signals: operational except for 3 channels with new dividers, to be fixed
    • LMS ready to go: fibers glued to crystals
      • Amount of light more than expected but not uniform: depends on where fiber is with respect to the center of the bundle
      • Working on adding a diffuser to improve uniformity
      • Considering using more than one LED
    • Install in hall next week?
  • Joanna continues wrapping crystals, can do 5-8/day
  • Igal looking into adding CPP muon detector into JEF simulation
  • Igal generating new MC samples for η→π0γγ studies