*'''Light monitoring system''' -- Arshak
 
*'''Light monitoring system''' -- Arshak
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''
 +
 +
=Minutes=
 +
Attendees: Bill, Arshak, Hakob, Sasha, Jane, Phil, Axel, Olga, Zizis, student interns, S.T.
 +
* Grand total fabricated FCAL-2 modules = 1603 + 9 (some crystals recovered from COMCAL have chips)
 +
** Module testing continues
 +
* Jane inspected 88 SICCAS crystals -- maybe 60-70 are good?
 +
* Fiber stripper for end to be inserted into integrating sphere due in August
 +
* Waiting for rest of fibers for LMS, due in September
 +
* Polishing of existing fibers ~70% dune
 +
* Bundling/labeling cables continues

Latest revision as of 07:45, 10 July 2023

Meeting time and location:


Agenda

  • Preparation of parts for ECAL modules -- Sasha
  • Module fabrication -- Sasha
  • Ongoing projects -- Sasha, all
  • Testing of PMT dividers -- Sasha / Vlad
  • Procedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
  • Light monitoring system -- Arshak
  • Simulations/Analysis

Minutes

Attendees: Bill, Arshak, Hakob, Sasha, Jane, Phil, Axel, Olga, Zizis, student interns, S.T.

  • Grand total fabricated FCAL-2 modules = 1603 + 9 (some crystals recovered from COMCAL have chips)
    • Module testing continues
  • Jane inspected 88 SICCAS crystals -- maybe 60-70 are good?
  • Fiber stripper for end to be inserted into integrating sphere due in August
  • Waiting for rest of fibers for LMS, due in September
  • Polishing of existing fibers ~70% dune