JEF meeting, June 9, 2023

From GlueXWiki
Revision as of 10:04, 8 June 2023 by Staylor (Talk | contribs) (Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting time and location:

Agenda

  • Preparation of parts for ECAL modules -- Sasha
  • Module fabrication -- Sasha
  • Visual inspections of fabricated modules [1]
  • Testing and labeling cables
  • Removing signal cables from the FCAL [2]
  • Testing of PMT dividers -- Sasha / Vlad
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
  • Light monitoring system -- Arshak
  • Simulations/Analysis
  • Talk at ECT* workshop next week -- Simon