Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 17: | Line 17: | ||
* Data analysis | * Data analysis | ||
* Simulations | * Simulations | ||
− | * FCAL2 Insert Efficiency in Phi -- Azizah | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah] |
Revision as of 00:04, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
- Chris continues to make brass strap assemblies
- Bobby has started working on honing soft iron housing (a few mu-metal are tight (no space for kapton film)
- Module fabrication -- Sasha
- Modules fabricated by Arshak and Sasha (list on Google Drive) (grand total 115, fabricated in about a month)
- Fabricated modules in TEDF
- Status of fabrication
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah