Difference between revisions of "JEF meeting, March 18, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 9: Line 9:
 
** Igal started cutting ESR foils needed by the DSG
 
** Igal started cutting ESR foils needed by the DSG
 
** Loan agreement with the GWU has been signed. Olga will come come in the beginning of next week (will work on checking PMT diameter and produce siliicon cookies); will take equipment to the GWU.  
 
** Loan agreement with the GWU has been signed. Olga will come come in the beginning of next week (will work on checking PMT diameter and produce siliicon cookies); will take equipment to the GWU.  
 +
*** 160 PMTs NPS PMTs can be exchanged (will need about 100 more, will work with Vlad on this)
 +
*** Diameter of 150 Hall D PMTs has be to be checked
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]

Revision as of 22:13, 17 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG: Continues to preshape ESR foils (80 per week) and wrap crystals with the ESR and Tedlar (5-8 modules a day)
    • Igal started cutting ESR foils needed by the DSG
    • Loan agreement with the GWU has been signed. Olga will come come in the beginning of next week (will work on checking PMT diameter and produce siliicon cookies); will take equipment to the GWU.
      • 160 PMTs NPS PMTs can be exchanged (will need about 100 more, will work with Vlad on this)
      • Diameter of 150 Hall D PMTs has be to be checked
  • Module fabrication -- Sasha
  • Light Monitoring System
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations