+ | =Minutes= | ||
+ | Attendees: Arshak, Phil, Sasha, Igal, Zisis, Liping, Tim B., Josh | ||
+ | *SICCAS update: 160 crystals (60 for Hall C) are packed ready to be shipped, tentatively on Friday 3/6. | ||
+ | ** On schedule to finish remaining 400 (of 500) in April, should receive at JLab by summer? | ||
+ | ** Need new contract for next set of 500 crystals | ||
+ | *** Needs DOE approval, could take awhile | ||
+ | *** Working out an agreement between Wuhan and SICCAS folks for crystal qa. | ||
+ | *** Specs stay the same, hopefully price per crystal will also stay the same. | ||
+ | * Light guide design has changed slightly: plan to go with machined 18.5 mm diameter rods | ||
+ | ** Increases price by a factor of 2, still okay with Eugene | ||
+ | ** Quote from Eljen is quite high, and don't have specs for material from Chinese supplier of original 18 mm diameter rods. | ||
+ | *Flanges on order | ||
+ | *Mu-metal cylinders: PR submitted | ||
+ | * Have 24 PMT (soft iron) housing pieces, not annealed yet. | ||
+ | *Most other pieces (except for the crystals themselves!) here ready for assembly. Plan to start with 30 from CUA. | ||
+ | *Summer students. | ||
+ | ** PHil C. will station a student at JLab for 8 weeks in the summer | ||
+ | ** Karthik from Regina will be here for 3 weeks in March-April | ||
+ | ** Liping recruiting students right now, 3-4 for summer? | ||
+ | * PMT base divider tests: 14 of 3x amplification variety already installed in COMCAL, 14 of the 6x variety awaiting 4-5 hours of downtime in the Hall | ||
+ | ** Plan to use COMCAL as TAC, also read out during regular data taking | ||
+ | *** Need gain calibration -- snake scan | ||
+ | * Loan agreement with UNCW is signed: Tim B. has PMT/divider | ||
+ | ** working on a longer term plan. | ||
+ | ** Plan to do rate tests, linearity studies. |
Revision as of 15:41, 9 March 2020
Meeting time and location= 10:00 am EST (JLab time) Hall D counting house
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- Status of the crystal production (SICCAS)
- Preparation for module fabrication
Minutes
Attendees: Arshak, Phil, Sasha, Igal, Zisis, Liping, Tim B., Josh
- SICCAS update: 160 crystals (60 for Hall C) are packed ready to be shipped, tentatively on Friday 3/6.
- On schedule to finish remaining 400 (of 500) in April, should receive at JLab by summer?
- Need new contract for next set of 500 crystals
- Needs DOE approval, could take awhile
- Working out an agreement between Wuhan and SICCAS folks for crystal qa.
- Specs stay the same, hopefully price per crystal will also stay the same.
- Light guide design has changed slightly: plan to go with machined 18.5 mm diameter rods
- Increases price by a factor of 2, still okay with Eugene
- Quote from Eljen is quite high, and don't have specs for material from Chinese supplier of original 18 mm diameter rods.
- Flanges on order
- Mu-metal cylinders: PR submitted
- Have 24 PMT (soft iron) housing pieces, not annealed yet.
- Most other pieces (except for the crystals themselves!) here ready for assembly. Plan to start with 30 from CUA.
- Summer students.
- PHil C. will station a student at JLab for 8 weeks in the summer
- Karthik from Regina will be here for 3 weeks in March-April
- Liping recruiting students right now, 3-4 for summer?
- PMT base divider tests: 14 of 3x amplification variety already installed in COMCAL, 14 of the 6x variety awaiting 4-5 hours of downtime in the Hall
- Plan to use COMCAL as TAC, also read out during regular data taking
- Need gain calibration -- snake scan
- Plan to use COMCAL as TAC, also read out during regular data taking
- Loan agreement with UNCW is signed: Tim B. has PMT/divider
- working on a longer term plan.
- Plan to do rate tests, linearity studies.