Difference between revisions of "JEF meeting, May 21, 2021"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...")
 
m (Minutes)
 
(3 intermediate revisions by the same user not shown)
Line 25: Line 25:
 
* COMCAL tests, TAC running, etc.
 
* COMCAL tests, TAC running, etc.
 
* Data analysis
 
* Data analysis
 +
** &eta;(') cross sections?
 
* Simulations
 
* Simulations
 +
** [[File:fcal2_update_may21.pdf]] Island/FCAL2 update (S.T.)
 +
 +
=Minutes=
 +
Attendees: Bill, Azizah, Arshak, Phil, Jane, Liping, Sasha, Jared, S.T.
 +
* Sasha finally able to communicate with SICCAS contact
 +
** Company still dealing with some issues
 +
** Delivery of next batch by sometime in June unlikely
 +
** Discussed arranging meeting with Rolf to discuss possible options
 +
** Discussed zoom meeting with SICCAS contact, next week
 +
* Sasha continues divider tests for COMCAL
 +
* Sasha constructed 2 more modules
 +
* Sasha met with Chris A. from Tim W.'s group to go over brazing
 +
* Sasha contacted detector support group:  sounds like group would have time to help out
 +
** ESR preshaping / wrapping of crystals considered as possible activities
 +
* Fernando still working on PMT divider redesign for FCAL2
 +
* Simon presented island algorithm progress report
 +
* We discussed getting &eta;(') cross sections from GlueX data
 +
** Considered inviting Mahmoud/George to give update at next JEF meeting

Latest revision as of 16:26, 21 May 2021

Meeting time and location= 9:00 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
  • Module fabrication
  • COMCAL tests, TAC running, etc.
  • Data analysis
    • η(') cross sections?
  • Simulations

Minutes

Attendees: Bill, Azizah, Arshak, Phil, Jane, Liping, Sasha, Jared, S.T.

  • Sasha finally able to communicate with SICCAS contact
    • Company still dealing with some issues
    • Delivery of next batch by sometime in June unlikely
    • Discussed arranging meeting with Rolf to discuss possible options
    • Discussed zoom meeting with SICCAS contact, next week
  • Sasha continues divider tests for COMCAL
  • Sasha constructed 2 more modules
  • Sasha met with Chris A. from Tim W.'s group to go over brazing
  • Sasha contacted detector support group: sounds like group would have time to help out
    • ESR preshaping / wrapping of crystals considered as possible activities
  • Fernando still working on PMT divider redesign for FCAL2
  • Simon presented island algorithm progress report
  • We discussed getting η(') cross sections from GlueX data
    • Considered inviting Mahmoud/George to give update at next JEF meeting