Difference between revisions of "JEF meeting, November 1, 2019"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 1:00 pm EST (JLab time) F228 =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jlab.org/blue...")
 
Line 24: Line 24:
 
*Update about SICCAS crystals
 
*Update about SICCAS crystals
 
*Theory input?
 
*Theory input?
 +
 +
=Minutes=
 +
Attendees:  Sasha,Liping,Zisis,Simon
 +
* CRYTUR crystals:  all 64 of first batch in house
 +
** Generally look good (did transmission tests for 10, light yield checks for 22)
 +
* SICCAS crystals:  on schedule for delivery in November
 +
** QA procedures in place (visual inspection, dimension checking, transmission, light yield)
 +
** Working on draft for service contract for Jane (Wuhan) to work on QA in China
 +
* Manpower:  Josh has been extended for 6 months; Arshak will be here for 3 months, possibly 6 months
 +
* Place for assembly fixed in TEDF
 +
* MRI: we were encouraged to resubmit, received some recommendations how to improve:
 +
** Since BSM physics is high risk/high reward, suggest adding more SM physics (mu/md sensitivity from &eta;&rarr;3&pi;?)
 +
** Firm up budget numbers?
 +
** Diversity, minority inclusion?
 +
** Dark scalar mediator sensitivity?
 +
** Impact of insert on GlueX PWA?

Revision as of 10:18, 4 November 2019

Meeting time and location= 1:00 pm EST (JLab time) F228


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • CRYTUR crystals (Sascha)
  • Update about SICCAS crystals
  • Theory input?

Minutes

Attendees: Sasha,Liping,Zisis,Simon

  • CRYTUR crystals: all 64 of first batch in house
    • Generally look good (did transmission tests for 10, light yield checks for 22)
  • SICCAS crystals: on schedule for delivery in November
    • QA procedures in place (visual inspection, dimension checking, transmission, light yield)
    • Working on draft for service contract for Jane (Wuhan) to work on QA in China
  • Manpower: Josh has been extended for 6 months; Arshak will be here for 3 months, possibly 6 months
  • Place for assembly fixed in TEDF
  • MRI: we were encouraged to resubmit, received some recommendations how to improve:
    • Since BSM physics is high risk/high reward, suggest adding more SM physics (mu/md sensitivity from η→3π?)
    • Firm up budget numbers?
    • Diversity, minority inclusion?
    • Dark scalar mediator sensitivity?
    • Impact of insert on GlueX PWA?