Difference between revisions of "JEF meeting, October 13, 2023"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")
 
(Agenda)
Line 4: Line 4:
  
 
=Agenda=
 
=Agenda=
*'''Preparation of parts for ECAL modules''' -- Sasha  
+
*'''Preparation of parts for ECAL''' -- Sasha  
 +
** - signal cables: 1360 short cables, all long cables are ready
 +
** - HV cables: 140 short cables, 36 long cables are in production
 +
** - LV cables: ordered
 +
 
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob
 
* '''Light monitoring system'''
 
* '''Light monitoring system'''
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''

Revision as of 21:55, 12 October 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables: 1360 short cables, all long cables are ready
    • - HV cables: 140 short cables, 36 long cables are in production
    • - LV cables: ordered
  • Testing of PMT dividers -- Sasha / Vlad
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
  • Light monitoring system
  • Analysis/Simulation