Difference between revisions of "JEF meeting, September 6, 2019"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location= 1:00 pm EST (JLab time) F228 =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jlab.org/blue...")
 
Line 22: Line 22:
 
=Agenda=
 
=Agenda=
 
Module fabrication status/plans
 
Module fabrication status/plans
 +
 +
=Minutes=
 +
Attendees: Liping,Sashas,Simon,Zisis
 +
* Jane from Wuhan received her visa and will be here in October; plan is to get her involved with QA (visual inspection,...) of crystals
 +
** We have some examples of yellow crystals to show
 +
* Josh is working on procedure write-up for crystal assembly
 +
* Some assembly details need to be finalized:  cookies, brazing, light guides
 +
** V. Popov will work with us this week to do tuning of divider design (amplification factor of 24 needs to be reduced to ~3 so that we can operate tube closer to Hamamatsu's HV spec)
 +
* Manpower: Zisis can provide students, probably next year; postdoc can ramp up activity probably this year
 +
** ITEP group has some members who could help out, but cannot come to US -- maybe to Canada?
 +
** Matrixing JLab resources?
 +
* Sasha set up wiki page with lots of JEF-related resources: [https://halldweb.jlab.org/wiki/index.php/FCAL_Insert]

Revision as of 08:58, 9 September 2019

Meeting time and location= 1:00 pm EST (JLab time) F228


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

Module fabrication status/plans

Minutes

Attendees: Liping,Sashas,Simon,Zisis

  • Jane from Wuhan received her visa and will be here in October; plan is to get her involved with QA (visual inspection,...) of crystals
    • We have some examples of yellow crystals to show
  • Josh is working on procedure write-up for crystal assembly
  • Some assembly details need to be finalized: cookies, brazing, light guides
    • V. Popov will work with us this week to do tuning of divider design (amplification factor of 24 needs to be reduced to ~3 so that we can operate tube closer to Hamamatsu's HV spec)
  • Manpower: Zisis can provide students, probably next year; postdoc can ramp up activity probably this year
    • ITEP group has some members who could help out, but cannot come to US -- maybe to Canada?
    • Matrixing JLab resources?
  • Sasha set up wiki page with lots of JEF-related resources: [1]