Difference between revisions of "JEF meeting, September 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...")
 
(Agenda)
Line 15: Line 15:
 
:: - Profiler to measure shower shape
 
:: - Profiler to measure shower shape
 
:: - Veto in the insert region
 
:: - Veto in the insert region
 +
*'''Simulation/Analysis'''

Revision as of 10:51, 7 September 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL modules -- Sasha
  • Module fabrication -- Sasha
  • Ongoing projects -- Sasha, all
  • Testing of PMT dividers -- Sasha / Vlad
  • Procedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
  • Light monitoring system -- Arshak
  • Miscellaneous
- Profiler to measure shower shape
- Veto in the insert region
  • Simulation/Analysis