=Minutes=
 +
Attendees: Sasha, Tegan, Arshak, Zisis, Phil, Jon, Olga, Jane, Liping, Tim B., Axel., S.T.
 +
* 10 more Crytur crystals arrived -- delivery rate is ~40-50/month
 +
* Sasha met with Tim and Fernando regarding installation plans for next year
 +
** Want thin readout cables with (rather expensive) lemo connectors
 +
** Plan to make meeting more regular
 +
* 75 more PMT housing units are arriving soon
 +
* Light guides becoming available
 +
* Waiting for brass straps (need ~300)
 +
* Detector support group working on wrapping modules
 +
* Module production to resume this week
 +
* Sasha plans to test PMT dividers before collaboration meeting
 +
** NPS saw noise issues -- hopefully with our lower amplifier gain this will not be an issue
 +
* Arshak is preparing a report on LMS efforts
 +
** Current design uses 2 plexiglas pieces
 +
** Uniformity at the level of 20% except near edges -- working on attenuation of the light in these regions
 +
** Light input currently from both top and sides -- Sasha suggested maybe switch to sides only?
 +
** Suggested stack some crystals near plexiglas, check for crosstalk
 +
** Will need to redo FCAL2 plexiglas (need to cut out the inner part) -- maybe need new plexiglas?
 +
** Plan to use FCAL system for control

Latest revision as of 08:20, 12 September 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Sasha, Tegan, Arshak, Zisis, Phil, Jon, Olga, Jane, Liping, Tim B., Axel., S.T.

  • 10 more Crytur crystals arrived -- delivery rate is ~40-50/month
  • Sasha met with Tim and Fernando regarding installation plans for next year
    • Want thin readout cables with (rather expensive) lemo connectors
    • Plan to make meeting more regular
  • 75 more PMT housing units are arriving soon
  • Light guides becoming available
  • Waiting for brass straps (need ~300)
  • Detector support group working on wrapping modules
  • Module production to resume this week
  • Sasha plans to test PMT dividers before collaboration meeting
    • NPS saw noise issues -- hopefully with our lower amplifier gain this will not be an issue
  • Arshak is preparing a report on LMS efforts
    • Current design uses 2 plexiglas pieces
    • Uniformity at the level of 20% except near edges -- working on attenuation of the light in these regions
    • Light input currently from both top and sides -- Sasha suggested maybe switch to sides only?
    • Suggested stack some crystals near plexiglas, check for crosstalk
    • Will need to redo FCAL2 plexiglas (need to cut out the inner part) -- maybe need new plexiglas?
    • Plan to use FCAL system for control