Difference between revisions of "Jan 07, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
(Items for followup from previous meeting(s))
Line 11: Line 11:
 
# Fcal
 
# Fcal
 
#* Specify the number of Rad Hard blocks to writeup a change request to the project.
 
#* Specify the number of Rad Hard blocks to writeup a change request to the project.
#* Fernando to provide information on how to turn on digitization on FADC.
 
#* Matt to supply Fernando with the latest Cockcroft-Walton schematics.
 
 
# Bcal
 
# Bcal
 
#* Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
 
#* Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
 
# Bcal readout
 
# Bcal readout
#* <strike> JLab will investigate purchasing some prototypes from Plastic Craft. </strike>
 
 
#* USM will investigate options for producing prototypes in Chile.
 
#* USM will investigate options for producing prototypes in Chile.
#* <strike> Zisis to check on status of Baby Bcal shipment. </strike>
 
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 18:15, 14 December 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
  2. Bcal
    • Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
  3. Bcal readout
    • USM will investigate options for producing prototypes in Chile.

Documents to Review

Tentative Agenda

  1. Announcements
    • Reminder: Next Thu Bcal Readout meeting internal status review of readout technology
  2. Review of Action Items
  3. Calibration/Monitoring
  4. Fcal
    • Fabrication contract (Elton and Matt)
    • CR for rad hard glass
    • PMT procurement
    • FCAL prototype update (Jake)
  5. Bcal
    • Construction Status
    • Construction Prototype ConstProto.jpg vs. Module 01 Mod01.jpg
  6. BCAL Readout
  7. Simulations
  8. Other business

Minutes

Attendees: