Difference between revisions of "Jan 07, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Items for followup from previous meeting(s))
 
(2 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
# Fcal
 
# Fcal
 
#* Specify the number of Rad Hard blocks to writeup a change request to the project.
 
#* Specify the number of Rad Hard blocks to writeup a change request to the project.
#* Check that darkroom is in installation budget (Elton)
+
#* <strike> Check that darkroom is in installation budget (Elton). Activity number 1562465 </strike>
 
# Bcal
 
# Bcal
 
#* Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
 
#* Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
 
# Bcal readout
 
# Bcal readout
 
#* USM will investigate options for producing prototypes in Chile.
 
#* USM will investigate options for producing prototypes in Chile.
 +
#* Jlab to send latest geometrical model of light guides to USM for reference.
  
 
= Documents to Review=
 
= Documents to Review=
Line 22: Line 23:
  
 
# Announcements
 
# Announcements
#* Reminder: Next Thu Bcal Readout meeting internal status review of readout technology
 
 
# Review of Action Items
 
# Review of Action Items
 
# Calibration/Monitoring
 
# Calibration/Monitoring
Line 29: Line 29:
 
#* CR for rad hard glass
 
#* CR for rad hard glass
 
#* PMT procurement
 
#* PMT procurement
#* FCAL [http://dustbunny.physics.indiana.edu/~jvbennet/simTalk.pdf prototype update] (Jake)
 
 
# Bcal
 
# Bcal
 
#* Construction Status
 
#* Construction Status
#* Construction Prototype [[Image:ConstProto.jpg|50px]] vs. Module 01 [[Image:Mod01.jpg|50px]]
 
 
# BCAL Readout
 
# BCAL Readout
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1390 FM light guide geometry] Chuck Hutton
 
#* [http://www.jlab.org/Hall-D/software/wiki/images/9/9e/Geant4CAD2.pdf GEANT4 CAD importer] Edward and Alam
 
 
# Simulations
 
# Simulations
 
# Other business
 
# Other business

Latest revision as of 18:40, 14 December 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
    • Check that darkroom is in installation budget (Elton). Activity number 1562465
  2. Bcal
    • Run MC to investigate changes in resolution due to different fiber attenuation length and light output.
  3. Bcal readout
    • USM will investigate options for producing prototypes in Chile.
    • Jlab to send latest geometrical model of light guides to USM for reference.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
  4. Fcal
    • Fabrication contract (Elton and Matt)
    • CR for rad hard glass
    • PMT procurement
  5. Bcal
    • Construction Status
  6. BCAL Readout
  7. Simulations
  8. Other business

Minutes

Attendees: