Difference between revisions of "Jan 12, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Minutes) |
|||
Line 16: | Line 16: | ||
== Minutes == | == Minutes == | ||
− | ''Attending: | + | ''Attending: |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + |
Revision as of 18:58, 5 January 2012
Action Items from previous meetings
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: