Revision as of 19:09, 5 January 2012
Action Items from previous meetings
- U-boards need to be ordered for the mini-Bcal (Chris)
- Cables need to be ordered for the SiPM production test setup
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: