Difference between revisions of "Jan 12, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# U-boards need to be ordered for the mini-Bcal (Chris)
+
# <strike> U-boards need to be ordered for the mini-Bcal (Chris) </strike> 10 boards ordered to check before ordering more
# Cables need to be ordered for the SiPM production test setup (Chris)
+
# <strike> Cables need to be ordered for the SiPM production test setup (Chris) </strike> Cables have been ordered
 
# Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM.
 
# Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM.
# Order any missing mechanical parts for assembly of mini-Bcal (Jim)
+
# <strike> Order any missing mechanical parts for assembly of mini-Bcal (Jim) </strike> All parts are in hand. Cooling plates are being modified to ease attachment of cooling tube.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==
Line 21: Line 21:
  
 
== Minutes ==
 
== Minutes ==
''Attending:
+
''Attending: Chris, Ivan, Elton, Jim, Yi, Carl, Eugene
 +
 
 +
# Announcements
 +
# Action Items
 +
# Schedule, reporting, and manpower (Elton)
 +
# SiPM production testing (everyone)
 +
# Mechanical assembly (Scot)
 +
# Mechanical (Jim)
 +
# Mechanical drawings (Chuck)
 +
# Temperature compensation (Jack)
 +
# Preamp-summing (Fernando/Chris)

Revision as of 18:22, 12 January 2012

Action Items from previous meetings

  1. U-boards need to be ordered for the mini-Bcal (Chris) 10 boards ordered to check before ordering more
  2. Cables need to be ordered for the SiPM production test setup (Chris) Cables have been ordered
  3. Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM.
  4. Order any missing mechanical parts for assembly of mini-Bcal (Jim) All parts are in hand. Cooling plates are being modified to ease attachment of cooling tube.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)
  1. SiPM testing (Ivan)

Minutes

Attending: Chris, Ivan, Elton, Jim, Yi, Carl, Eugene

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)