Jan 12, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 19:09, 5 January 2012 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. U-boards need to be ordered for the mini-Bcal (Chris)
  2. Cables need to be ordered for the SiPM production test setup

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)
  1. SiPM testing (Ivan)

Minutes

Attending: