Difference between revisions of "Jan 13, 2011 Readout"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
  
 
# Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM)
 
# Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM)
# Resolution including summing SiPMs (IU)
+
# <strike> Resolution including summing SiPMs (IU) </strike> Update today and ongoing
# Detailed schedule for testing at USM (Elton and Will).
+
# Detailed schedule for testing at USM (Elton and Will). In progress
# George to send Elton information regarding the laser head so a new one can be ordered.
+
# <strike> George to send Elton information regarding the laser head so a new one can be ordered.</strike> PR submitted for replacement. Shipping documents in preparation.
# JLab to ship a SiPM Array to USM. Electronics and sensor to be shipped in Jan.
+
# <strike> JLab to ship a SiPM Array to USM. Electronics and sensor to be shipped in Jan.</strike> Estimated completion in two weeks.
  
 
= Documents to Review=
 
= Documents to Review=
Line 38: Line 38:
 
= Minutes =
 
= Minutes =
 
''Attending:
 
''Attending:
 +
 +
# Announcements
 +
# Review of Action Items
 +
# [http://www.jlab.org/Hall-D/software/wiki/images/f/f8/USM_Update_13_01_11.pdf Update - USM]
 +
#* SiPM test station (Alam)
 +
#* Light guide fabrication (Iñaki)
 +
# SiPM update
 +
#* Preparations for testing
 +
#* Regina preparations
 +
# Simulations
 +
#* Granularity [http://argus.phys.uregina.ca/gluex/DocDB/0016/001661/002/BCAL%20fADC%20Groups%20EResolution.ppt Dan]
 +
# Electronics/cooling (Fernando)
 +
# Geometry and light guides

Revision as of 14:53, 14 January 2011

Teleconference Time: 10:30 a.m. EST

  • ESNET 8542553 and EVO session
  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.

Items for followup from previous meeting

  1. Collect this information of testing (including goals and setup) on the wiki for ease of presenting information. (USM)
  2. Resolution including summing SiPMs (IU) Update today and ongoing
  3. Detailed schedule for testing at USM (Elton and Will). In progress
  4. George to send Elton information regarding the laser head so a new one can be ordered. PR submitted for replacement. Shipping documents in preparation.
  5. JLab to ship a SiPM Array to USM. Electronics and sensor to be shipped in Jan. Estimated completion in two weeks.

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Update - USM
    • SiPM test station (Alam)
    • Light guide fabrication (Iñaki)
  4. SiPM update
    • Preparations for testing
    • Regina preparations
  5. Simulations
    • Granularity Dan
  6. Electronics/cooling (Fernando)
  7. Geometry and light guides

Minutes

Attending:

  1. Announcements
  2. Review of Action Items
  3. Update - USM
    • SiPM test station (Alam)
    • Light guide fabrication (Iñaki)
  4. SiPM update
    • Preparations for testing
    • Regina preparations
  5. Simulations
    • Granularity Dan
  6. Electronics/cooling (Fernando)
  7. Geometry and light guides