Difference between revisions of "Jan 15, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 21: Line 21:
 
# Announcements
 
# Announcements
 
# FCAL Update
 
# FCAL Update
 +
## FCAL Calibration [http://www.ph.ed.ac.uk/~claire/Tarbert_FCALCalibration.pdf Claire's Slides (PDF)]
 
# BCAL Update
 
# BCAL Update
 
## Bcal construction schedule
 
## Bcal construction schedule

Revision as of 11:41, 15 January 2009

Teleconference Time: 11:00 EST/10:00 CST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Dec 22 meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of Bcal on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Report on the Bfield components in the region of the Bcal readout (JLab for next meeting).
  3. Options for vendors delivering specific lead sheet sizes (Tim)

Documents to Review

Tentative Agenda

  1. Announcements
  2. FCAL Update
    1. FCAL Calibration Claire's Slides (PDF)
  3. BCAL Update
    1. Bcal construction schedule
      • First Article Fibers from Kuraray arrive first week in February
    2. Magnetic Field Update (Elton)
    3. Updates on SiPM tests
  4. GlueX collaboration meeting
  5. Any other business

Minutes

Attending: