Line 19: | Line 19: | ||
# Updated Base plate drawing: [http://www.jlab.org/~whitey/BCAL/BASE_PLT_12-10-08.pdf Latest base plate dwg] need to remove inserts for machining | # Updated Base plate drawing: [http://www.jlab.org/~whitey/BCAL/BASE_PLT_12-10-08.pdf Latest base plate dwg] need to remove inserts for machining | ||
− | = Action Item List = | + | = Tentative Agenda = |
+ | |||
+ | # Announcements | ||
+ | # Swager reactivation | ||
+ | # Beam/plate leveling on machining and layup tables | ||
+ | # Installation: how to lift matrix from Al base plate off steel beam | ||
+ | # Latest changes to drawings | ||
+ | # Review action item list | ||
+ | # Other business | ||
+ | |||
+ | = Action Item List = | ||
# <strike>Tim will supply updated drawings and post on DocDB by this friday</strike> | # <strike>Tim will supply updated drawings and post on DocDB by this friday</strike> | ||
Line 31: | Line 41: | ||
#* Construction Manager: Progress at UofA on job description, job ad | #* Construction Manager: Progress at UofA on job description, job ad | ||
#* Co-Op job ads | #* Co-Op job ads | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= Minutes = | = Minutes = | ||
''Attendees: Regina - Zisis, George, Dan, Keith Alberta - Gilbert, Jan, JLAB - Tim, James'' | ''Attendees: Regina - Zisis, George, Dan, Keith Alberta - Gilbert, Jan, JLAB - Tim, James'' |
Revision as of 12:42, 19 January 2009
Contents
Teleconference Instructions
Meeting time 14:00-15:00 Newport News / 13:00-14:00 Regina / 12:00-13:00 Edmonton
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Quick Reference Links
Documents to Review
- Updated Wedge drawing: Latest wedge machined dwg
- Updated Base plate drawing: Latest base plate dwg need to remove inserts for machining
Tentative Agenda
- Announcements
- Swager reactivation
- Beam/plate leveling on machining and layup tables
- Installation: how to lift matrix from Al base plate off steel beam
- Latest changes to drawings
- Review action item list
- Other business
Action Item List
-
Tim will supply updated drawings and post on DocDB by this friday -
Swager reactivation and rolling spacing check (Zisis/George) - Gilbert will submit a list of all tools required and cost estimates by middle of next week. Mostly completed.
- Gilbert will send a drawing of the machining set up for Jlab to reference.
- Detailed schedule for preparation for module production (Gilbert).
-
Tim to supply 3d stp/iges files to Regina/Alberta. - In progress: George submitted a QA plan last month. Needs to be reviewed by Tim and Elke.
- Manpower
- Construction Manager: Progress at UofA on job description, job ad
- Co-Op job ads
Minutes
Attendees: Regina - Zisis, George, Dan, Keith Alberta - Gilbert, Jan, JLAB - Tim, James