Jan 22, 2009 BCAL Construction
From GlueXWiki
Revision as of 13:52, 22 January 2009 by Elton (Talk | contribs) (→Action Item List Oct 15 Alberta Meeting)
Contents
Teleconference Instructions
Meeting time 14:00-15:00 Newport News / 13:00-14:00 Regina / 12:00-13:00 Edmonton
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Quick Reference Links
Documents to Review
- Dan's drawing of a leveling system for BCAL modules: Media:Wedge_Leveling.jpg
- Electropneumatic Press photos
- Electropneumatic Press videos
- Updated Wedge drawing: Latest wedge machined dwg
- Updated Base plate drawing: Latest base plate dwg need to remove inserts for machining
Tentative Agenda
- Announcements
- Swager reactivation
- Beam/plate leveling on machining and layup tables (see "Documents to Review" Item 1 above).
- Installation: how to lift matrix from Al base plate off steel beam
- Latest changes to drawings (see links above).
- Review action item list
- Other business
Action Item List
-
Tim will supply updated drawings and post on DocDB by this friday -
Swager reactivation and rolling spacing check (Zisis/George) - Gilbert will submit a list of all tools required and cost estimates by middle of next week. Mostly completed.
- Gilbert will send a drawing of the machining set up for Jlab to reference.
- Detailed schedule for preparation for module production (Gilbert).
-
Tim to supply 3d stp/iges files to Regina/Alberta. - In progress: George submitted a QA plan last month. Richard will flush the plan and prepare the document.
- Manpower
- Construction Manager: Progress at UofA on job description, job ad
- Co-Op job ads
Action Item List Oct 15 Alberta Meeting
Minutes
Attendees: Regina - Zisis, George, Dan, Keith Alberta - Gilbert, Jan, JLAB - Tim, James