Difference between revisions of "Jan 24, 2011 Calibration/Monitoring"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 22: Line 22:
  
 
''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''
 
''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''
 +
 +
# Review goals/objectives and background information:
 +
#* Revised ETC request timetable for the BCAL/FCAL Monitoring Project will indicate May 2011 - April 2012.  There is a reasonably firm plan for the FCAL and the same needs to be achieved for the BCAL by May or sooner.
 +
#* Dynamic range of SiPMs is planned to be 400.  Andrei's plots show at least 200, so there is some safety margin built in.
 +
# George Voulgaris' slides:
 +
#*
 +
# Discuss Matt's idea:
 +
#*
 +
# Summarize info:
 +
#*

Revision as of 17:30, 24 January 2011

Teleconference Time: 09:00 CST (Regina) / 10:00 EST / 17:00 GMT+2 (Athens)

  • ESNET preferred, EVO as a backup

Background information

Tentative Agenda

  1. Review goals/objectives of Monitoring system and past discussions.
  2. George Voulgaris' slides: Media:AnswersaboutLED.pdf
  3. Discuss Matt's suggestion: groove in light guides, radial fibres. (sent as email)
  4. Summarize info, prepare recommendations and discuss it in Working Group to reach conclusion and proceed with Athens Construction MOU (decision by May 2011).

Minutes

Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)

  1. Review goals/objectives and background information:
    • Revised ETC request timetable for the BCAL/FCAL Monitoring Project will indicate May 2011 - April 2012. There is a reasonably firm plan for the FCAL and the same needs to be achieved for the BCAL by May or sooner.
    • Dynamic range of SiPMs is planned to be 400. Andrei's plots show at least 200, so there is some safety margin built in.
  2. George Voulgaris' slides:
  3. Discuss Matt's idea:
  4. Summarize info: