Jan 25, 2011 Calibration/Monitoring

From GlueXWiki
Revision as of 12:42, 24 January 2011 by Elton (Talk | contribs) (Background information)

Jump to: navigation, search

Teleconference Time: 09:00 CST (Regina) / 10:00 EST / 17:00 GMT+2 (Athens)

  • ESNET preferred, EVO as a backup

Background information

Action Items

  1. Consider dual level settings on LEDs, one to fire near SiPM, the other to fire the far pmt (perhaps overflowing the near SiPM)
  2. Give (approximate) power consumption for LED calibration board
  3. Ask George if dynamic range plot for points on LED plot were due to intrinsic limitations.

Tentative Agenda

  1. Review goals/objectives of Monitoring system and past discussions.
  2. George Voulgaris' slides: Media:AnswersaboutLED.pdf
  3. Discuss Matt's suggestion: groove in light guides, radial fibres. (sent as email)
  4. Summarize info, prepare recommendations and discuss it in Working Group to reach conclusion and proceed with Athens Construction MOU (decision by May 2011).

Minutes

Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)