Difference between revisions of "Jan 31, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 26: Line 26:
 
# Review of Action Items
 
# Review of Action Items
 
# Monitoring.
 
# Monitoring.
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1891 First Results with UV LEDS]
 
 
# FCAL
 
# FCAL
 
## Construction Status: mechanical, bases (notes from Matt)
 
## Construction Status: mechanical, bases (notes from Matt)
 
## Beam tests in Hall B (John)
 
## Beam tests in Hall B (John)
 
# BCAL
 
# BCAL
## 2006 Beam test analysis at forward angles: [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1887]
 
 
## [[BCAL Beam Tests 2012]]
 
## [[BCAL Beam Tests 2012]]
## SiPM  [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1890 PDE extraction] at Regina
 
## [http://pdn.sciencedirect.com/science?_ob=MiamiImageURL&_cid=271580&_user=859303&_pii=S0168900210008156&_check=y&_origin=search&_zone=rslt_list_item&_coverDate=2010-08-21&wchp=dGLbVlt-zSkzV&md5=9f009a21ee5214aa9f32f6b0a0da28a7/1-s2.0-S0168900210008156-main.pdf Characterization studies of silicon photomultipliers NIM A620 (2010) 217] (Link for JLab)
 
##* [[Media:NIMA620-217.png|Key Figure 8]]
 
 
# USM update
 
# USM update
## [https://halldweb1.jlab.org/wiki/images/4/4b/PDE_comparisons_17Jan2012.pdf PDE measurement update at USM]
 
 
# TDR update
 
# TDR update
 
#* [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).
 
#* [[Private:Instructions for the TDR | Instructions for  the TDR]] (You must be logged into the wiki to access this page).

Revision as of 10:22, 27 January 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime.
  2. TDR
    • Create outline to assign writing homework (Elton)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
    2. Beam tests in Hall B (John)
  5. BCAL
    1. BCAL Beam Tests 2012
  6. USM update
  7. TDR update
  8. Simulations/Reconstruction
  9. Any other business

Minutes

Attending: