Difference between revisions of "January 12, 2009 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
Line 23: Line 23:
 
* Discuss decisions required to complete CDC design (straw config, length of straws, current gas leak, plenum wire config)
 
* Discuss decisions required to complete CDC design (straw config, length of straws, current gas leak, plenum wire config)
  
 +
* FDC-CDC tracking studies [[Media:20090112_fdc_tracking.pdf|PDF]]
 
   
 
   
 
* AOT
 
* AOT

Revision as of 13:19, 12 January 2009

Meeting Time and Place

Monday January 12, 2008 at 1:30pm At Jefferson Lab, the meeting will be held in room F326

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements
  • Status of FDC
  • Status of CDC
  • Discuss decisions required to complete CDC design (straw config, length of straws, current gas leak, plenum wire config)
  • FDC-CDC tracking studies PDF
  • AOT