Difference between revisions of "January 12, 2009 Tracking CDC/FDC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 25: Line 25:
 
* Discuss decisions required to complete CDC design:
 
* Discuss decisions required to complete CDC design:
 
** straw configuration (Geometry C from David)
 
** straw configuration (Geometry C from David)
** length of straws (optimization study_
+
** length of straws (optimization study)
 
** current gas leak
 
** current gas leak
 
** electronic hookup
 
** electronic hookup
 
   
 
   
 
* AOT
 
* AOT

Revision as of 13:26, 12 January 2009

Meeting Time and Place

Monday January 12, 2008 at 1:30pm At Jefferson Lab, the meeting will be held in room F326

Connections

To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 39527048# (remember the "#")

Agenda

  • Announcements
  • Status of FDC
  • Status of CDC
  • FDC-CDC tracking studies PDF
  • Discuss decisions required to complete CDC design:
    • straw configuration (Geometry C from David)
    • length of straws (optimization study)
    • current gas leak
    • electronic hookup
  • AOT