Difference between revisions of "January 13, 2022 CPP Design/Install Meeting"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Time and Place == Thursday January 13, 2022, 3:00pm Bluejeans https://bluejeans.com/465620466 * Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon,...")
 
(Agenda)
 
(3 intermediate revisions by the same user not shown)
Line 12: Line 12:
 
** All assembly hardware in house
 
** All assembly hardware in house
 
** Test install in the TEDF High bay - cpmpleted, much learned
 
** Test install in the TEDF High bay - cpmpleted, much learned
  [[image:cpp_install_chambers.pdf]] [[image:cpp_S&A_chambers.pdf]]  
+
  [[image:cpp_S&A_chambers.pdf|thumb]]  
 
** Steel absorbers have been fiducialized
 
** Steel absorbers have been fiducialized
 
* Installation/assy 3D Model and dwgs all completed except Microscope move
 
* Installation/assy 3D Model and dwgs all completed except Microscope move
** LV attach
+
** LV attach and ground
** Scintillator orientation
+
** Chamber order
 
* Microscope move
 
* Microscope move
 
* Target Design in work [[image:cpp_target5.jpg|thumb]] [[image:cpp_target6.jpg|thumb]] [[image:cpp_target7.jpg|thumb]] [[image:cpp_target8.jpg|thumb]]
 
* Target Design in work [[image:cpp_target5.jpg|thumb]] [[image:cpp_target6.jpg|thumb]] [[image:cpp_target7.jpg|thumb]] [[image:cpp_target8.jpg|thumb]]
Line 33: Line 33:
 
** CPP Detector operations in Hall D OSP
 
** CPP Detector operations in Hall D OSP
 
** Possible use of nitrogen flow for cooling electronics in Faraday cage
 
** Possible use of nitrogen flow for cooling electronics in Faraday cage
 +
** Helium bag inside CDC
  
 
== Minutes ==
 
== Minutes ==
  
 
==Action Items ==
 
==Action Items ==

Latest revision as of 16:42, 13 January 2022

Meeting Time and Place

Thursday January 13, 2022, 3:00pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S, Beni, Simon, Mark I, Anthony

Agenda

Cpp S&A chambers.pdf
    • Steel absorbers have been fiducialized
  • Installation/assy 3D Model and dwgs all completed except Microscope move
    • LV attach and ground
    • Chamber order
  • Microscope move
  • Target Design in work
    Cpp target5.jpg
    Cpp target6.jpg
    Cpp target7.jpg
    Cpp target8.jpg
    • Most parts made (a good portion are 3D printed)
    • Will do a test assy next week


  • Things to work out
    • Gas system, manifold/bubblers (Beni has some)
    • Complete structural analysis - approved by Tom Renzo - need to release into system
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements
    • Modified US vacuum system
    • Solid target installation
    • Installation drawing including Microscope move
    • CPP Detector operations in Hall D OSP
    • Possible use of nitrogen flow for cooling electronics in Faraday cage
    • Helium bag inside CDC

Minutes

Action Items